Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Messages - abdeljalil elghazoui

#1
تحية طيبة الرجاء مراجعة الترجمة التالية
width = الطول
height = الارتفاع
#2
Mr Volker First of all, we offer you and Mr. Liviu all thanks and appreciation for your efforts with us as Moroccan users. Actually, we, as Moroccans, bear the responsibility, we have long been absent from the forum, but this is an important reason, which is that version 42 largely responds to the aspirations of the Moroccan user. Only the interface of displaying the results remained. Professor Khaled Ait Ben Omar is currently working on a new interface in version 52 and he coordinates with you in  This is why we hope you will help us in this work and do not deprive us of future development Finally, we trust you and Mr. Levio to ensure that we are familiar with the work in the regular Moroccan version
#3
We hope to preserve the characteristics of the Moroccan version
#4
Quote from: YOUSSEF HOUIET on May 21, 2020, 11:09:46 AM
سلام سي عبد الجليل
في نظري حبذا لو تفتح موضوعا جديدا في منتدى النسخة المغربية
حول الدورة التكوينية التي تسجلها الآن

وتكون فرصة لتنشيط النقاش هنا أيضا
[/size]

ذلك ما أريد فعله هو اعادة تحيين لهذه الدورة
بشكل مفصل ان شاء الله
#5
thank you my friend
This is what will allow me to do it
I don't mind but temporarily
#6
To Mr. Liviu
I would like to make adjustments to the following topic
https://lalescu.ro/liviu/fet/forum/index.php?topic=1956.0
But it seems to me that I am forbidden to change it
Is there a solution, my dear friend
#8
Quote from: Liviu Lalescu on October 31, 2019, 03:18:54 PM
I just released the latest Morocco43 and Algeria43, both with these two new constraints. Please see the custom versions for each version (on the forum or on the FET homepage). The test link above will not function anymore. Thank all of you for the suggestions!
Currently I only have a computer of the type
   32 bytes
I will try to get another for experimentation
#9
I'm traveling now when I come back, I'll try
#10
تحياتي استاذي
لقد استغملت عدد ايام فردي
بالنسبة للمغرب دائما نستعمل عدد ايام 12
كل يوم حقيقي يساوي يومان بالنسبة لبرنام فيت
لكن برمجيا دائما فيت يعتبر اليوم الاول والثاني هما يوم الاثنين
والثالث والرابع هما يوم الثلاثاء
وهكذا
يمكنك الاستعانة بالفيديو التالي
https://www.youtube.com/watch?v=BIiz2KL7Ook&feature=youtu.be

سلسلة تكوينية عن بعد
http://www.idara.awrak.ma/?cat=17&paged=2
بالتوفيق
#11
greetings Livio
concerning
**teacher room not available times**
That's right
concerning
**room changes for teachers**
What we want is:
**Teachers maximum Room changes per day**
With sincere thanks and respect
#12
"About the other request: teacher+room+time not available. How should we add this in the interface? Enter a teacher, enter a room, select times from a matrix? Or enter a teacher, select some rooms in a list, and select times from a matrix? (in this last case the times apply to all the rooms)."
in arabic: أوقات غير متاحة لأستاذ في قاعة
in eng: Times not available to the teacher in room
#13
Quote from: Liviu Lalescu on September 24, 2019, 09:11:05 PM
So the first teacher can work in 2 rooms and the second teacher in 3 rooms, max room changes per day = 0?

For the max room changes per day, why can't you add each room in a separate building, and use max building changes per day/week = 0?

Do you really need the teachers to work in maximum 2 or 3 rooms, or they can work in any number of rooms across the week, only respecting the same room each day? For instance work in 5 rooms in total (over the week) is allowed?

About the other request: teacher+room+time not available. How should we add this in the interface? Enter a teacher, enter a room, select times from a matrix? Or enter a teacher, select some rooms in a list, and select times from a matrix? (in this last case the times apply to all the rooms).

For changes of rooms for teachers
In most institutions, a significant proportion of teachers do not change rooms during the week.
This is currently not available in FET
As in the example
and there are those who change from once to six times
#14
Quote from: Liviu Lalescu on September 21, 2019, 03:05:29 PM
Hello, Mr. abdeljalil elghazoui,

If for example the teacher works in maximum two rooms per week, can he work in R1, then in R2, then in R1, then in R2 again?

Could you give me a graphical example of an acceptable timetable?

Is it the same as I propose, activities occupy max different rooms, but you only want an easier to add constraint?
Hi my friend
I'm sorry for you
For the work of the teachers in the rooms
The teacher can work in the same room the same day
But that can change from day to day
See example in pictures
#15
Quote from: Liviu Lalescu on September 20, 2019, 10:57:55 PM
Thank you!

For (2), I will try it.

For (1), I was asking for clarifications, so please explain to me what I have asked, so I understand exactly the problem. It is important so I do not work wrongly on other direction and my work is wasted.

I am currently quite busy and tired, but I will try to help you with this in the future. But please clarify (1).
Greetings Livio
What we want is as follows
When I chose for the teacher for example ten rooms
I want a restriction that determines the number of changes in these rooms
For example, choose only one per week
Or the teacher works in two or three rooms a week
This limitation must concern either a teacher
Or for all teachers