Hi,
I am currently planning the timetable for a Sports Department at a FE College in the UK. I have to timetable 15 groups. Some groups have restrictions, for instance the KS4 are only in on a Tuesday.
However, I have managed to work out how to limit a group to a certain and or specific day, but I was wondering if there is a rule I can apply to tell FET to timetable and limit a group to 3 full days out of 5, but which days does not matter.
I hope this makes sense, cause I am not sure if it does to me.
Cheers
Richard
Constraint students (set) interval max days per week, interval = whole day.
Wonderful. Thank you so much.