see this file The difference between the program and the mind The first program of making the human mind and the program of making Fit program can see the difference
The program first no professor taught section two disjoint or by Fit program there, a professor studying section two disjoint
http://arab4load.info/downloadf-5b0113503040291-rar.html
I'm sorry, but I do not understand.
like math i want Distribution of hours 1 +1 +1 +1 +1 I do not want 2 +1 +1 +1
Then put min 1 days between activities with weight 100%, instead of 95%, for Maths.
I have this subject is experience but the program stopped and did not complete
Then the data is too constrained and you need to make it easier for FET, by lowering other constraints.
http://arab4load.info/downloadf-ef7713503269521-rar.html
open this by fet and see teacher name ر1 and ر2 and ر3 and ر4 and ر5 and see Activity Minimum number of days between activities
Weight (percentage)=100% and say me why dont Complete
Most probably the timetable is too difficult, please make it easier.
How
Reduce hours from teachers, from students, or reduce other constraints.
thanks