Hi there
While I was generating my timetable I got this error message
QuoteSimulation impossible! Maybe you can consider lowering the constraints. تم حفظ النتائج في المسار C:\Users\hp\fet-results\timetables\تجارب احتياطي بيجام_data_and_timetable-single
معلومات اضافية تتعلق باستحالة جدولة المهام:
يرجى التحقق من القيود المتصلة بالمهمة أدناه ، والتي قد يكون من المستحيل وضع جدول زمني لها :
ت: 1, معرف: 199 (مد:سعيد, ما:دراسات, ط:3.2)
that means I should lower the constraints.
But how
How could I lower the assigned constraints?
go to FET -> Data -> Activities
Select that activity, so you can see in the right window all directly related constraints to that directory.
Also think about indirectly constraints.
Choose one of that constraint and
a) lower/increase a value. (For Example "max hours" from 1 to 2. Or "min hours" from 2 to 1.)
or
b) delete one of that constraints
I should try
:o :o :o