Hi, all;
I am testing an interesting time-table case. Let's say one subject (2 hours) is taught by two teachers. One teacher is assigned with 50 minutes, 10 minutes break, then another teacher with 60 minutes. Since two teachers are teaching the same subject, so they need to be "grouped" as described in FET constraint.
But now I got "break" here, if I set all three as three different activities, then I have to "group all three up", but I cannot force "break" activity is in the middle of all three. I want it to be auto-generated, so the break time is un-defined.
What I want it to be are as the following two cases:
either 50-10-60 (minutes)
or 60-10-50 (minutes)
Is it possible to add another constraint on "grouped three"? Please let me know, thank you.
Add 2 "2-grouped" constraints: 50, 10, then 60, 10 :-)