Good afternoon I came to a doubt and would like to know how to solve it.
Is it possible for me to generate my picture without informing a teacher explicitly? But I will enroll all teachers and their qualifications for various disciplines, so the FET would choose teachers randomly according to their qualifications.
The second question is, if the previous one is possible, would I have to define that it would use all the availability of a teacher (if he has the qualification for those disciplines) instead of putting another one in the place?
For example:
Teachers: Qualification
Teacher 1 Geography, Mathematics, Physics
Teacher 2 Mathematics
Teacher 3 Physics
I wanted, for example, to allocate Professor 1 for all the activities he has enabled (in this case all) if his time load is logically possible.
I tried adding a restriction of min of days in the week to all but then those who have nothing (0 allocated activities) give me an error.
Any idea how I can do this?
obs: in the activities register I'm importing them from a .csv and leaving the teacher field blank, so that he chooses the teacher, would that be it?Good afternoon I came to a doubt and would like to know how to solve it.
It is not that easy.
Activities without teacher will remain with no teacher.
FET official needs the exact teacher for each exact activity. Teachers' qualifications are only useful in the GUI, as a filter. They are neglected in the timetable generation.
You can use FET-mapr, but it is very difficult to use and I have no really successful reports. Or you can use tricks like I devised successfully for Peter B here: https://lalescu.ro/liviu/fet/forum/index.php?topic=3961.0
I read the post of Peter B that you mentioned and I saw that you created another FET, analyzing it at first seems to be equal to the Official.
Would you have any idea how I would do this "draw" of teachers according to your qualification? or is it not possible?
Quote from: erikmatos on May 08, 2019, 07:09:50 PM
I read the post of Peter B that you mentioned and I saw that you created another FET, analyzing it at first seems to be equal to the Official.
I am not sure I remember everything, but I think I added a new constraint for Peter B, "min simultaneous activities in selected time slot", so that for instance he has minimum 5 students for a teacher in a specified slot. You might not need this.
Quote
Would you have any idea how I would do this "draw" of teachers according to your qualification? or is it not possible?
I wrote in my answer above. Either use FET-mapr (but it is very complicated and might not lead to good results), or devise tricks. For Peter B the timetable was for a single day, and I considered FET days = real hours and FET hours = real teachers. Then I allocate activities with only students to time slots. I am not sure if this can help you, if you have more complicated data.
my data are the common ones of school:
Teachers
subjects
classes
building
classes
The additional would be to allocate the teacher according to their abilities and available timetable