Hi ,
Firstly I want to thank you for making our lives easy with the FET software. Though it has a learning curve but over a period of time I am slowly trying to grasp the software GUI . I require a few inputs from the forum.
- The routine has a max count of twenty five per week but it is only showing a max of 21 how do i increase it to 25?
- Each class has four free period how do I push it to last period?
- I tried introducing a free as a subject but it is not generating and showing a error that max is 21hrs how do I get over it.
I have attached the FET file and the hours screen shot for your reference.
Regards
Somak
Hello and thank you for the appreciation!
2. I think you need like the attached file - see the last constraint I added.
I do not understand 1. - these are statistics for the working hours of the students.
Also, I do not understand 3. - you may add an activity split into 4 per week for each students set, with preferred times in the last slots of the days, but it is easier and better in my way (see my solution to 2.)
about 2)
in normal case you do it by adding:
- max gaps = 0 for students
- students must begin early
- min hours per day for students
the advantage of this variant is that it is more independent from the number of hours of students
Thanks a lot Liviu
You have solved the issue .
What I meant by the statistic is that the load is 21 period per week and the actual available as per the schedule is 25 per week. SO there is a a gap of four period per week. How do I increase the max count to 25 period per week?
Thank you again
Regards
Somak
Quote from: somakmaitra on June 23, 2019, 05:38:49 PM
What I meant by the statistic is that the load is 21 period per week and the actual available as per the schedule is 25 per week. SO there is a a gap of four period per week. How do I increase the max count to 25 period per week?
Oh, this is not showing the number of free hours, but the maximum number of working hours from all the subgroups of that group.
Thanks a lot Liviu