Hello,
say I have a suject that it is supposed to have 6 hours per week, I can schedule a split like 2+2+1+1, but it could also be acceptable a solution like 2+2+2 if the first one is not possibile in the timetable.
Is there a way to configure a secondry or "backup" split schema?
Thank you,
Michele
Say: (A1, A2, A3, A4)=(2, 2, 1, 1). Then remove the default min days between activities for them and add 5 constraints min 1 days 100%: (A1, A2), (A1, A3), (A1, A4), (A2, A4), (A2, A4). Then you can add an optional 0%-100% min 1 days (A3, A4).
Another solution: add only a single constraint activity tag max 2 hours daily.
There are possible more approaches, but I prefer the first. But there are many constraints to add.