Good day,
We have science practicals that happen in a laboratory. There are too many to fit into the lab for the week. Is there a way that I can mark all the practical periods and then say those periods can overlap, but can't overlap more than once in a weekly cycle, i.e. that I can say this week Physics has a prac and next week Bio has a prac.
It can place however way it wants, there are no other timing constraints, as long as there are not more than 1 clash in a weekly cycle between activities with a certain tag.
I hope this makes sense.
Thank you,
Adele
Maybe by using Timeconstraints -> Activities -> Others 2 -> Max simoltanius activities
Select all those activities, select all timeslots and set max 2 simoltanius.