I have put a snapshot. From the ChangeLog:
- Added the possibility of restarting a single selected thread in the generate multiple timetables dialog (suggested by Yush Yuen).
Please test and let me know. The download link, as usual:
https://lalescu.ro/liviu/fet/download/test/
I added a new snapshot:
- Added the option to view the initial order of placing the activities in the generate multiple timetables dialog (suggested by Yush Yuen).
I added a new snapshot:
- Improvements in the interface (Yush Yuen reported that when resizing the constraints' dialogs the list of constraints was not resized to the full possible size).