Hi, sorry to open a new topic to this, because i tried google but no luck, how and where can I check which activities is not scheduled/placed? I tried looking but couldn't find where. Thank you very much <3
Hello,
Absolutely no problem!
FET reports the conflicts after the generation, which will show a 10'000 weighted conflict for each unplaced activity. Or on a locked timetable use a filter on the activities, detailed description with constraints does not contain the string for activity preferred starting time. Or in activities.xml in results check for empty day/hour (something like <Day></Day>).
Quote from: Liviu Lalescu on January 06, 2026, 08:12:11 AMHello,
Absolutely no problem!
FET reports the conflicts after the generation, which will show a 10'000 weighted conflict for each unplaced activity. Or on a locked timetable use a filter on the activities, detailed description with constraints does not contain the string for activity preferred starting time. Or in activities.xml in results check for empty day/hour (something like <Day></Day>).
Thank you so much, however, I have problem generating my timetable... I really need some help...
I am wondering, it is wise to split the duration into smaller pieces? For example: 2 duration, i split into 1+1 duration...
Attached file for anyone who can help me how to adjust... I really have no idea how now
I removed students years, groups, and subgroups, and only remained a students subgroup. See attached file. It is still impossible. Please try to find your mistake by reviewing the highest-stage timetable.
In my place, most of the school is using aSc, now I know why they used to it
We need to add another function "test" for system to check if the activities is fit to each card before we generate, it is hard to find which activities in which classes in FET, I need to guess the impossible.
I am sorry, but I do not understand the problem nor the solution. Maybe you could detail. If it is possible, I'll do it soon, otherwise I will list it as a suggestion from you in the TODO list.
I am not 100% sure, but it sounds like you are adding activities by "FET -> Data -> Activities" only, Please got to "FET -> Advanced -> Activity Planning". There are statistics and a nice grid, so you don't need to "guess" what activity is missing.
Your timetable is impossible, because of the activities with duration 1.
You force Ph on Monday 1st.
You also force 3 other on Tuesday, Wednesday and Thursday in 12th hour.
But the 3 activities of subject 体育与健康教育 (体育教育) are not allowed on Monday nor in the 12th hour.
You have got only 7 activities with duration 1.
So in the 12th hours are needed 3 activities (7-4=4 left).
体育与健康教育 (体育教育) should be not on Monday (4-3=1 left). That last activity Ph is is on Monday 1st hour. But now you have a problem, since there is no partner activity left on Monday 2nd hour nor a partner for one activity of subject 体育与健康教育 (体育教育). That is impossible. There must be 2 times 2 activities with duration 1 on the same day consecutive.