FET Forum

FET Support (English) => General Stuff => Topic started by: fetUser on February 27, 2009, 08:11:18 AM

Title: Activity every two weeks
Post by: fetUser on February 27, 2009, 08:11:18 AM
Hello, i'm trying to define an activity, that should be done every two weeks. I don´t see any option to define this when I create the activity, and I can't faind any constraint to define something to reflect this.

¿Can someone help me?

Thanks
Title: Re: Activity every two weeks
Post by: Liviu Lalescu on February 27, 2009, 08:40:53 AM
There is no such option in FET, unfortunately. You could use a trick, like I wrote in the Help/FAQ: if you have for instance activity A1(teacher T1, students S1), A2 (T2, S2), A3(T1, S2), A4(T2, S1). A1 and A2 are both at the same time in week 1 and A3 and A4 are both at the same time in week 2. Then consider a FET activity A(T1+T2, S1+S2) - weekly.

I know that Horatiu, a Romanian user, solved his timetable this way.
Title: Re: Activity every two weeks
Post by: Volker Dirr on February 27, 2009, 05:39:31 PM
There are also some other variants. i think the best solution depend on you situation? (always teh same teacher or not? always the same students sets or not?)

have a look at:
http://www.timetabling.de/manual/FET-manual.en.html#id_36