Messages - catalin

#1
Romanian / Română / Re: pentru universitati?
March 29, 2009, 08:14:43 AM
Thank you for your answer.

I've made the mistake to ask the question before reading the documentation.

Thank you,
Catalin
#2
Romanian / Română / pentru universitati?
March 28, 2009, 05:52:22 PM
Salut,

aplicatia poate fi utilizata si pentru universitati?
Mentionez citeva restrictii:
-cursuri comune pentru studentii (grupe) de la mai multe specializari, de la mai multe facultati
-seminarii/lab. pe grupe/semi-grupe
-posibilitate de a specifica nr de ore/sapt. (curs la 2 sapt.)

Multumesc,
Catalin Maican
#3
Suggestions / Re: Tag+Space constraints
February 13, 2010, 07:56:55 PM
It does not... it allocates about 480/560 activities this way...
questions:
-why does this constraint (students work in an hourly interval max days per week) has to weight 100%?
-why max days per week for all/one teacher/s has to be 100%?

if the weight could be lowered it would be more flexible, isn't it?

Thanks,
Catalin
#4
Suggestions / Re: Tag+Space constraints
February 12, 2010, 07:17:46 AM
Hi,
I've checked the data again and it seems that I needed more Course rooms.... When I added them FET could solve the timetable even with 100% all contraints

One more question: is it possible to have for students one free day? For teachers I use "max days per week for all/one teacher/s"
Thanks
Catalin
#5
Suggestions / Re: Tag+Space constraints
February 11, 2010, 02:29:24 PM
Thank you for the setting

I do not mind that seminaries go into course rooms... but I do mind that there are a lot of un-allocated activities to rooms (as soft-conflicts)... How do I get rid of them?

If I set the constraints to 100% FET cannot generate a timetable... if not (<99%) I get unallocated activities although there are free rooms.

Catalin
#6
Suggestions / Re: Tag+Space constraints
February 11, 2010, 12:58:48 PM
Sorry... I've forgot to delete some constraints..

this is the correct file.
#7
Suggestions / Re: Tag+Space constraints
February 11, 2010, 12:53:56 PM
QuoteI think you are wrong. Add preferred rooms 100% for seminars: all rooms. Then 95% for act. tag seminar, rooms: seminars and projects rooms.

Modify 95% to 90% or 97% or 99%, if it is too much or low.

You cannot have exactly your requirement, you need to find a good value (this 95%), that gives you a good solution, in which all seminar rooms are filled. Maybe a higher value is better, but you need to have a solvable timetable.

Please let me know.

LATER EDIT: In FET, each constraint with 100% is satisfied all the time, with 95% is satifisfied in about 95% of cases (more or less).

Hi,
I've reviewed a little this old topic and I'm still not elucidated... How should I "Add preferred rooms 100% for seminars: all rooms"? Should I go through each activity and specify that if it has seminar the importance to be 100%? That should be a little to much because I have many activities with this tag...

The same is for Courses and Labs...
Please see my input file...

Thanks,
Catalin
#8
Suggestions / Re: Tag+Space constraints
April 08, 2009, 05:14:58 PM
QuoteI think I know your problem:

activity tag pref rooms: seminar. Please add ALL allowed rooms with 100% and the preferred rooms with 95%. I mean, as it is now, COPY rooms from 95% to 100%.

Please let me know if now is solvable and attach the new file.

For example, if preferred rooms are: R1, R2 and not preferred but allowed are R3 and R4, add 100% R1, R2, R3, R4 and 95% R1, R2.
Ok, it works like that, but it fills up the amphitheaters with seminars/projects (and, of course, courses) and the rooms for the seminars stay empty.

The way I proposed the constraints, it should:
- fill up the amphitheaters (rooms for courses) with course activities (100%);
- fill up rooms for seminars and projects with this kind of activities (100%)
- fill up the rest of amphitheaters with seminars/projects activities (95%)

Please see the attached input file. rooms CP1-6 are the amphitheaters mentioned above, while the BP1-7 (seminar rooms) are almost empty.

Catalin
#9
Suggestions / Re: Tag+Space constraints
April 08, 2009, 04:32:00 PM
Through the 2 constraints above I would like something like this:
1. fill in courses and laboratories (100%) in the allocated space
2. fill in seminars and project (100%) in the allocated space
3. for the seminars and projects, if there are not enough rooms fill in other available rooms, meaning rooms for courses and labs (95%)

In my tests:
- FET filled in rooms for seminars (100%)
- _did not_ filled any room for courses and labs

I attache a new input file, this time smaller, with fewer activities
Catalin
#10
Suggestions / Re: Tag+Space constraints
April 08, 2009, 03:39:18 PM
Ok...

I have a sample input file filled with everything.

For the new constraints (Activity Tag Space Constraints):
-Course - amphitheaters , 100%
-Labs - laboratories, 100%
-Seminars - 2 constraints - special rooms for seminars and projects 100% AND laboratories + amphitheaters, 95%
-Projects - 2 constraints - special rooms for seminars and projects 100% AND laboratories + amphitheaters, 95%

Please tell me if this constraint set is possible.

[Later edit]: FET stops after about 2-5 minutes with "Simulation interrupted. FET could not find a perfect timetable...."

Catalin
#11
Suggestions / Tag+Space constraints
March 29, 2009, 12:51:07 PM
I would find useful the addition of the following constraint:
-space constraint + activity tag constraint

e.g.: for the Activities tagged as "laboratories" to be able to set a certain set of rooms. The same for the Activities tagged as "courses".

(there is a workaround but this requires to specify constraints for all subjects, which is much too much, considering that about half of our activities require a certain set of rooms)

Thank you,
Catalin
#12
I would also find this constraint useful: max gaps per day for a students set

Thanks you,
Catalin
#13
Get Help / Flexible students min hours daily
February 15, 2010, 12:45:51 PM
Hi,
Is there a possibility to make this constraint more flexible "Students min hours daily". For teachers there is an explanation that this is flexible so that teachers don't get a class in their "free" day...

How about for students? If I specify min hours daily, the activities would be placed entire week, even if there is only one class per day. Also, specifying min 2 classes/day would result a minimum 10 activities for a set of students, even if these students have only let's say 8 activities... Am I right?

Thanks,
Catalin
#14
Get Help / Re: Please help with room allocation
April 03, 2009, 09:21:50 AM
Thank you very much!

Catalin
#15
Get Help / Re: Please help with room allocation
April 03, 2009, 09:12:02 AM
In other words is it possible for a teacher to work only between 7.30 and 13 every day?

catalin