Thanks for your reply, is that the only way to achieve this by making 10 (2*5) days? and need to double all the activities? (also need to double other time constraint?)
Besides, I want to know the usage of the following:
"A set of activities occupies max time slots from selection" and
"maximum simultaneous activities from a set in selected time slots"
Thanks a lot again!
Besides, I want to know the usage of the following:
"A set of activities occupies max time slots from selection" and
"maximum simultaneous activities from a set in selected time slots"
Thanks a lot again!