Main Menu
Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Messages - somakmaitra

#1
Thanks a lot Liviu
#2
Thanks a lot Liviu
You have solved the issue .
What I meant by the statistic is that the load is 21 period per week and the actual available as per the schedule is 25 per week.  SO there is a a gap of four period per week. How do I increase the max count to 25 period per week?

Thank you again
Regards
Somak
#3
Hi ,
Firstly I want to thank you for making our lives easy with the FET software. Though it has a learning curve but over a period of time I am slowly trying to  grasp the software GUI . I require  a  few  inputs from the forum.

  • The routine has a max count of twenty five per week but it is only showing a max of 21 how do i increase it to 25?
  • Each class has four free period how do I push it  to last period?
  • I tried introducing a free as a subject but it is not generating and showing a error that max is 21hrs how do I get over it.
I have attached the FET file and the hours screen shot for your reference.
Regards
Somak