#1
Thanks a lot. So, I have to add this constraint to activity and not to subactivity, is this correct?
Works as a charm!

M
#2
Hi
I have expanded this one:
- each activity is splitted, added tags * (without teacher), + (with teacher). Most of the groups have one without, one with teacher; only a few one have both sessions with the same teacher.
- More timeslots (additional times for sessions without teacher)
- Added a Time constraint 100% for all sessions with teacher (activity tag +) to omit sessions with teacher in the additional timeslots > in the timeslots marked yellow in the pdf, there should be no activities with teacher, only without teacher (activity tag *).

The system finds solutions and says "number of broken soft constraints: 0", but there are some activities with teachers in these additional timeslots. Any clue, what I should change here?

And by the way: do you have a Donation system?

Best M
#3
Hi Liviu

Perfect, thanks!
PPS: "Example 3: High School and Universities" in the FET-Manual

Best
Markus
#4
Hi

I have used FET for smaller projects until now. I have now a new task to build a timetable for a chamber music course.

  • 6 teachers
  • 37 students
  • 2 days (in fact, there are 6 days, but there are two "model days" (A+B), repeated two times)
  • 7 Hours a day
  • Some room restrictions, but these data are not yet available
  • Students play in groups between 2 and 9 persons, each group can play only 1 time a day
  • Some groups play only on 1 day, others on two days (days A+B)
  • A group is teached by 1 teacher (always the same)
I used the example 3: High School and Universitäres and added the data accordingly (imported csv-file). As Most of the students play in several group, there are several identical subgroups (as subgroup = student). When I have only 8 groups, it works perfectly. But when I add more groups, the timetable can not be generated: "... because the number of hours for subgroup is 16 and you have only 2 days x 7 hours in a week. But I have 6 teachers x 2 days x 7 hours = 84 possibilities.

What I am doing wrong here?  (FET-file attached)