Main Menu
Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Messages - ekawaluya

#2
1. csv maker is available now, please try one again !

2.thanks for the advice about " There are some links on my page, relating to mp3 downloads and free pdf books to download and others".
I will immediately remove it from my pages !
#3

Hello all,
Since 2003 I use my own program that I created with VBA excel to compose a generation schedule automatically. I do not immediately use a FET as the difficulty of entering data and constrains that too much. But this was 2 years later I choose to use a FET to compile timetable for my school that developing  buildings and has many far-flung. With the FET process becomes easy and fast generate.

Thank you very much for FET team.

One solution to enter data by importing files. csv or .txt "students" and "activities" is a file "subject", "tag activity" would develop its own.
I created a program "csv maker" using VBA excel to create the file .csv or .txt (notepad compatible).
First enter the data classes, subjects, teachers and teaching contracts. Run the macro it and at the root of c: \ will create the file (students.txt, eng) or "siswa.txt" (id)  and (activities.txt, eng) or "kegiatan.txt" (id) . Then enter your csv data with import this file to FET.

You can change / modify as needed.

Sorry , I can't upload this file because any reasons.

Please visit my blog at ( ekawaluya.blogspot / Indonesian)

I am in Temanggung Indonesia
#4
In my experience, the most easily, without the constraints generated time tables. Without constraint in just seconds. Then enter the constraints one by one, according to the priorities.