Hi:
I am considering to use FET for our college timetable problemas. However, I am quite lost.
It seems that FET can optimize a weeky timetable, and just that. I mean, all weeks have the same classes the same hours. ¿is this right?
The problem I have to solve is to allocate a fixed number of activitiies in a period of several weeks. For instance, we have courses like
- Biochemistry: 40 lectures, 16 labs, 14 seminars
- History: 30 lectures, 10 labs, 30 seminars
etc. up to 6 similar courses in a 15 weeks period.
Each for two student groups/sections per class. And several "classes" sharing time and classrroms
So, we do not have a fixed number of activities per week , but a fixed total number of activities per term.
Can FET address this type of problem?, resulting in a calendar with different activities on different weeks?
In addition, can FET manage holidays dates?
Thanks
I am considering to use FET for our college timetable problemas. However, I am quite lost.
It seems that FET can optimize a weeky timetable, and just that. I mean, all weeks have the same classes the same hours. ¿is this right?
The problem I have to solve is to allocate a fixed number of activitiies in a period of several weeks. For instance, we have courses like
- Biochemistry: 40 lectures, 16 labs, 14 seminars
- History: 30 lectures, 10 labs, 30 seminars
etc. up to 6 similar courses in a 15 weeks period.
Each for two student groups/sections per class. And several "classes" sharing time and classrroms
So, we do not have a fixed number of activities per week , but a fixed total number of activities per term.
Can FET address this type of problem?, resulting in a calendar with different activities on different weeks?
In addition, can FET manage holidays dates?
Thanks