Hello all,
I am in need of some serious scheduling help. I found this program via a friend of mine but cant make much sense of it. I work with kids, dolphins, therapist and time and its one big mess. Currently we try to plan everything from the head but that's taking too much time. I am trying to figure out wether I can do the scheduling, or better yet generate the schedule automatically via FET.
My assignment: distribute the kids combined with on of 12 therapist over 5 dolphins and 4 timeslot
However
Some kids have limits, like specific therapist and dolphins (one or both)
Some therapist have limits on their day
etc.
I want to know if the program can, when there is no restriction and no preference for time or dolphin or therapist automatically distribute these and put them in a schedule? And if so, how do I realize that?
thank you for your help
I am in need of some serious scheduling help. I found this program via a friend of mine but cant make much sense of it. I work with kids, dolphins, therapist and time and its one big mess. Currently we try to plan everything from the head but that's taking too much time. I am trying to figure out wether I can do the scheduling, or better yet generate the schedule automatically via FET.
My assignment: distribute the kids combined with on of 12 therapist over 5 dolphins and 4 timeslot
However
Some kids have limits, like specific therapist and dolphins (one or both)
Some therapist have limits on their day
etc.
I want to know if the program can, when there is no restriction and no preference for time or dolphin or therapist automatically distribute these and put them in a schedule? And if so, how do I realize that?
thank you for your help