Hi everybody!
I'm happy do be back after a so long time... I'm working to update my translation,,, And I hope you all are well!
But now I'm back to see if my daughter Federica that's working in a Hospital can take advantage of FET
She is involved to prepare tyhe scheduling of 7 doctors that work in two divisions (classes?): 3 slots/ hours 8, 14 and 20 in first one. 2 slots/ 8, 14 in second one.
When a doctor works at 20 o'clock, he needs to be free the same day (no work at 8 and 14) and the day after (no work 8, 14 and 20).
Do you think that may I manage some constraints to respect this condition?
I can't figure how FET may constraint an activity looking at the scheduling of the previous day...
Thank you very much for every effort to give a solution...

m
I'm happy do be back after a so long time... I'm working to update my translation,,, And I hope you all are well!
But now I'm back to see if my daughter Federica that's working in a Hospital can take advantage of FET
She is involved to prepare tyhe scheduling of 7 doctors that work in two divisions (classes?): 3 slots/ hours 8, 14 and 20 in first one. 2 slots/ 8, 14 in second one.
When a doctor works at 20 o'clock, he needs to be free the same day (no work at 8 and 14) and the day after (no work 8, 14 and 20).
Do you think that may I manage some constraints to respect this condition?
I can't figure how FET may constraint an activity looking at the scheduling of the previous day...
Thank you very much for every effort to give a solution...

m