تحية طيبة الرجاء مراجعة الترجمة التالية
width = الطول
height = الارتفاع
width = الطول
height = الارتفاع
This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.
Show posts MenuQuote from: YOUSSEF HOUIET on May 21, 2020, 11:09:46 AM[/size]سلام سي عبد الجليل
في نظري حبذا لو تفتح موضوعا جديدا في منتدى النسخة المغربية
حول الدورة التكوينية التي تسجلها الآن
وتكون فرصة لتنشيط النقاش هنا أيضا
Quote from: Liviu Lalescu on November 07, 2019, 03:11:45 PM
There are available 32-bit versions of FET, done by Volker. See https://www.timetabling.de/download/32bit/
Quote from: Liviu Lalescu on October 31, 2019, 03:18:54 PMCurrently I only have a computer of the type
I just released the latest Morocco43 and Algeria43, both with these two new constraints. Please see the custom versions for each version (on the forum or on the FET homepage). The test link above will not function anymore. Thank all of you for the suggestions!
Quote from: Liviu Lalescu on September 24, 2019, 09:11:05 PM
So the first teacher can work in 2 rooms and the second teacher in 3 rooms, max room changes per day = 0?
For the max room changes per day, why can't you add each room in a separate building, and use max building changes per day/week = 0?
Do you really need the teachers to work in maximum 2 or 3 rooms, or they can work in any number of rooms across the week, only respecting the same room each day? For instance work in 5 rooms in total (over the week) is allowed?
About the other request: teacher+room+time not available. How should we add this in the interface? Enter a teacher, enter a room, select times from a matrix? Or enter a teacher, select some rooms in a list, and select times from a matrix? (in this last case the times apply to all the rooms).
Quote from: Liviu Lalescu on September 21, 2019, 03:05:29 PMHi my friend
Hello, Mr. abdeljalil elghazoui,
If for example the teacher works in maximum two rooms per week, can he work in R1, then in R2, then in R1, then in R2 again?
Could you give me a graphical example of an acceptable timetable?
Is it the same as I propose, activities occupy max different rooms, but you only want an easier to add constraint?
Quote from: Liviu Lalescu on September 20, 2019, 10:57:55 PMGreetings Livio
Thank you!
For (2), I will try it.
For (1), I was asking for clarifications, so please explain to me what I have asked, so I understand exactly the problem. It is important so I do not work wrongly on other direction and my work is wasted.
I am currently quite busy and tired, but I will try to help you with this in the future. But please clarify (1).