OLD - FET-5.15.0 snapshot available for testing

Started by Liviu Lalescu, September 27, 2011, 12:12:26 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Liviu Lalescu

I have released a new snapshot, minor improvements in recent files list, advanced filter and split year dialogs, now settings are stored but also removed, for instance if you had 5 recent files and cleared the list, these are removed also from settings.

Please test recent files list, advanced filter for all time/space constraints, divide year automatically (split year), they should store/retrieve correctly the settings.

Liviu Lalescu

I have released a new snapshot. The old limit of 60,000 time constraints and 60,000 space constraints is lifted (although I think nobody needed this, but just in case).

Also, I added one more FAQ entry.

Liviu Lalescu

#32
I added a new snapshot. Significant speed improvement for the new constraint activities occupy max time slots from selection, in some cases (problem found with the Morocco sample file, trying to make the max hours per real day for students = 7, noticing that the speed was much slower).

Liviu Lalescu

#33
I added a new snapshot. Minor interface improvements in the activities and subactivities dialogs, when the strings in other language are longer. Please check these two dialogs.

Also, I deactivated translation for weight strings. These should remain in English, as 100 and 95.0. Please check some constraints' dialogs: list, add, modify.

Liviu Lalescu

I added a new snapshot, minor change in menu for activities time constraints, now the new "max simultaneous in selected time slots" is lower, under the "not overlapping" entry.

Liviu Lalescu

I added a new snapshot, because I corrected some crash bugs when playing with the number of days and hours and having a view timetable opened.

Also, when modifying the number of hours or days, FET will modify or remove affected constraints. Please check.

Liviu Lalescu

I added a new snapshot, minor code cleanup.

Chafik Graiguer

#37
Well
There was a constraint " A set of subactivities has a set of preferred time slot"
it's details was as fellow:

QuoteTime constraint
Subactivities with:
Component number=5
All teachers
All students
Subject=..
All activity tags
have a set of preferred time slots (all hours of each affected subactivity must be in the allowed slots):
Friday1 07:00;  Friday1 08:00;  Friday1 09:00;  Friday1 10:00;  Friday1 11:00;  Friday1 12:00;  Friday2 07:00;  Friday2 08:00;  Friday2 09:00;  Friday2 10:00;  Friday2 11:00;  Friday2 12:00
Weight (percentage)=100

After deleting the last 3 days:Friday1 , Friday2 and Saturday1
The details become as fellow:
QuoteTime constraint
Subactivities with:
Component number=5
All teachers
All students
Subject=..
All activity tags
have a set of preferred time slots (all hours of each affected subactivity must be in the allowed slots):

Weight (percentage)=100

Is this the intended behavior, or should the constraint be removed totally ?

Liviu Lalescu

Quote
Is this the intended behavior, or should the constraint be removed totally ?

Yes, it is intended, I only remove activity preferred starting time, which cannot be repaired.

Liviu Lalescu

#39
I have put a new snapshot, to repair all necessary constraints, like max hours daily and so on, when modifying the number of days or hours.

I tested all constraints, but it would be advisable for users to help with testing, like in recent previous posts, to add some constraints and modify the number of days or hours. I changed the code, so even preferred times and not available and the rest should be re-tested.

Please report problems.

I am sorry, these are last minute bug fixes. The best would be to wait with the official release at least 1 week from now.

Liviu Lalescu

I added a new snapshot, minor strings changes.

Liviu Lalescu

#41
I added a new snapshot, improvements:

1) Language change - is done instantly (without restarting FET) :-)

2) Some untranslated buttons in dialogs, like: "OK", "Yes", "Yes to All", "Cancel", are now available for translation.

Please test and report.

So, release is again postponed a few days, maybe Friday or later. Sorry.

Liviu Lalescu

I added a new snapshot, minor string improvements.

Liviu Lalescu

#43
I added a new snapshot, minor code cleanup.